Baltic Pipeline System-II

Baltic Pipeline System-II
Location
CountryRussia
ProvinceBryansk Oblast
Smolensk Oblast
Tver Oblast
Novgorod Oblast
Leningrad Oblast
StartUnecha
Passes throughSmolensk
ToUst-Luga
Kirishi
Runs alongsideLuga River
General information
TypeCrude oil
OperatorTransneft
Construction started
2009
Commissioned2011
Technical information
Length1,170 km (730 mi)
Maximum discharge
50 million tons per year
No. of pumping stations
8

The Baltic Pipeline System-2 (BPS-2, Russian: Балтийская трубопроводная система 2, БТС-2) is a second trunk line of the Baltic Pipeline System. The pipeline is constructed and operated by Russian oil pipeline company Transneft. The BPS-2 was completed in 2011 and began to function in late March 2012.