BD Bacatá

BD Bacatá
BD Bacatá under construction
Interactive map of the BD Bacatá area
Hotel chainEurostars
Record height
Tallest in Colombia since 2 April 2015[I]
Preceded byTorre Colpatria, Bogotá
196 m (643 ft)
General information
TypeMixed-use
LocationCalle 19 #5-20, Santa Fe, Bogotá,  Colombia
Coordinates4°36′17.1″N 74°04′13.2″W / 4.604750°N 74.070333°W / 4.604750; -74.070333
Named forHotel Bacatá
Construction started
October 2011
Topped-out24 July 2015
Estimated completion
unknown
Height
Architectural
  • South tower:
    216 m (709 ft)
  • North tower:
    167 m (548 ft)
Technical details
Floor count
  • South tower:
    67 floors
  • North tower:
    56 floors
Design and construction
Architecture firm
Grupo Alonso Balaguer
DeveloperBD Promotores
Structural engineer
Prabyc Ingenieros
Other information
Number of stores30
Number of rooms300
Parking
  • 739 places
  •  405 private
  •  334 public
Website
www.pbpsa.com/case-studies/bd-bacata---bogota-co
References

BD Bacatá (abbreviation for Bogotá Downtown Bacatá) is an architectural complex currently under construction in Bogotá, Colombia, featuring the tallest building in the country, surpassing the Torre Colpatria, and the sixth tallest in South America. The South Tower is 67 stories high and covers a total surface area of 1,200,000 square feet (111,480 m2). Development includes office and retail space, apartments and a 364-room hotel, replacing the former Hotel Bacatá that was constructed in the same location. It will be the tallest skyscraper in Colombia, and the first crowdfunded skyscraper, meaning that it was funded by private individuals through the purchase of shares and fiduciary rights allowed under Colombian law.

The project's main investor, Spanish national Venerando Lamelas, stopped disbursing funds to the contractor Prabyc Ingenieros, leaving the works unfinished. The company Total Co took over the project's recovery in the final quarter of 2024, with a plan to complete the unfinished floors of the South Tower and renovate apartments in line with sales flow; however, by early 2026 the company reported that 30% of the work remained to be done. A total of 133 billion COP $ in debt has been registered.