Azeri–Chirag–Gunashli
| Azeri–Chirag–Gunashli | |
|---|---|
Location within Caspian Sea | |
| Country | Azerbaijan |
| Region | Caspian Sea |
Offshore/onshore | Offshore |
| Coordinates | 40°1′4″N 51°15′58″E / 40.01778°N 51.26611°E |
| Operator | AIOC |
| Partners | SOCAR, BP, MOL Plc., Inpex, ExxonMobil, TPAO, ONGC |
| Field history | |
| Discovery | 1985 |
Start of production | 1997 |
| Peak year | 2010 |
| Production | |
Current production of oil | 330,000 barrels per day (~1.6×107 t/a) |
Year of current production of oil | 2025 |
Current production of gas | 10×106 m3/d (350×106 cu ft/d) |
Peak of production (oil) | 823,100 barrels per day (~4.101×107 t/a) |
Estimated oil in place | 5,000 million barrels (~6.8×108 t) |
Azeri–Chirag–Gunashli (ACG, Azerbaijani: Azəri-Çıraq-Günəşli), also known as Azeri–Chirag–Deepwater Gunashli, is a complex of offshore oil and gas reservoirs in the Caspian Sea, about 120 kilometres (75 mi) off the coast of Azerbaijan. It consists of the Azeri and Chirag oil fields and the deepwater portion of the Gunashli oil field. The total development area covers 432.4 square kilometres (167.0 sq mi). The contract area contains estimated oil reserves in excess of 5.2 billion barrels.
The development is operated by BP Exploration (Caspian Sea) Limited on behalf of the Azerbaijan International Operating Company (AIOC) consortium. Peak oil production of approximately 823,100 barrels per day (130,860 m3/d) was reached in 2010. Production subsequently declined as the mature fields entered a period of declining output. Production averaged approximately 330,000 barrels per day in 2025. In the first quarter of 2026, production averaged approximately 325,000 barrels per day, with approximately 29 million barrels produced during the quarter.
BP reports that crude oil from ACG is exported through the Baku–Tbilisi–Ceyhan pipeline to the Mediterranean Sea, the Baku-Supsa Pipeline to Supsa in Georgia, and the Baku-Novorossiysk Pipeline to Novorossiysk in Russia. The ACG block also contains non-associated natural gas reserves. In 2024, BP and its co-venturers announced an agreement to advance the exploration, appraisal, development and production of these resources. The first non-associated gas production from ACG began in 2026.
In 2009, IHS CERA (Cambridge Energy Research Associates)ranked ACG third among 20 of the world's largest oil-fields, based on production. Total investment was estimated at US$20 billion at the time. In 2008, oil from the ACG fields accounted for approximately 80% of Azerbaijan's total oil production, including exports and domestic consumption. Contemporary estimates projected that the project could generate up to and was expected to generate up to US$80 billion in profits for Azerbaijan.
The Azeri Central East (ACE) platform, the seventh production platform in the ACG development, began oil production in April 2024.