Arroyito, Neuquén
Arroyito | |
|---|---|
Municipality and village | |
Arroyito Location within Neuquén Province Arroyito Location within Argentina | |
| Coordinates: 39°5′S 68°35′W / 39.083°S 68.583°W | |
| Country | |
| Province | Neuquén Province |
| Department | Confluencia Department |
| Population (2001) | |
• Total | 81 |
| Time zone | UTC−3 (ART) |
| Climate | BWk |
Preview warning: Page using Template:Infobox settlement with deprecated parameter
settlement_type. Replace with type.Preview warning: Page using Template:Infobox settlement with deprecated parameter
timezone. Replace with time_zone.Preview warning: Page using Template:Infobox settlement with deprecated parameter
blank_info. Replace with custom_data_sec1.Preview warning: Page using Template:Infobox settlement with deprecated parameter
blank_name. Replace with custom_label_sec1.Preview warning: Page using Template:Infobox settlement with deprecated parameter
pushpin_map_caption. Replace with pushpin_caption.Preview warning: Page using Template:Infobox settlement with deprecated parameter
imagesize. Replace with image_size.Preview warning: Page using Template:Infobox settlement with deprecated parameter
pushpin_mapsize. Replace with pushpin_map_size.Preview warning: Page using Template:Infobox settlement with deprecated parameter
image_caption. Replace with caption.Preview warning: Page using Template:Infobox settlement with deprecated parameter
image_skyline. Replace with image.Preview warning: Page using Template:Infobox settlement with multiple other deprecated parameters. Fix those above and preview again.
Arroyito is a village and municipality in Neuquén Province in southwestern Argentina. It is located 54 km south of the city of Neuquén, at the junction of National Route 22 and National Highway 237. Arroyito has 81 inhabitants (INDEC, 2001), representing an increase of 68.75% in ten years compared to the previous census with 48 inhabitants (INDEC, 1991).
The Arroyito Dam lies on the Limay River, about 55 kilometres from the village. It has a heavy water production plant with a capacity of 200 t / year, operated by the state company ENSI. The Sulzer Brothers of Switzerland were hired to implement the project, originally intended for completion in 1984.