Araneta City Cyberpark

Araneta City Cyberpark
Araneta City Cyberpark in 2025
Interactive map of the Araneta City Cyberpark area
General information
StatusUnder Development
TypeOffice
LocationGen. Aguinaldo Ave. cor. Gen. McArthur Ave., Araneta City, Quezon City, Metro Manila, Philippines
Coordinates14°37′07″N 121°03′16″E / 14.61858°N 121.05442°E / 14.61858; 121.05442
Construction started
2007 (Telus, APAC, EGS House)
2014 (Cyberpark Tower 1)
2016 (Cyberpark Tower 2)
2019 (Cyberpark Tower 3)
Completed
2008 (Telus, APAC, EGS House)
2016 (Cyberpark Tower 1)
2018 (Cyberpark Tower 2)
2025(Cyberpark Tower 3)
Opening2008 (Telus, APAC, EGS House)
2016 (Cyberpark Tower 1)
2018 (Cyberpark Tower 2)
2025 (Cyberpark Tower 3)
Cost₱20 billion ($394.88 million)
₱4 billion per tower (estimate)
OwnerACI Inc.
OperatorACI Inc.
Height
Roof122 m (400 ft) (Cyberpark Tower 1 including helipad)
126 m (413 ft) (Cyberpark Tower 2 and Tower 3 including helipad)
Technical details
Floor count30 (Cyberpark Tower 1)
31 (Cyberpark Tower 2 & Tower 3)
3 Basement Parking Levels
Floor area288,000 m2 (3,100,006.20 sq ft) (completed)
550,000 m2 (5,920,150.73 sq ft) (upon completion)
Lifts/elevators12 Smart High-Speed Elevators (All Towers)
Design and construction
ArchitectASYA Design
DeveloperACI Inc.
Main contractorMetro Stonerich (Telus & Alorica House)
Megawide Construction Corporation (Tower 1 & Tower 2)
Datem Incorporated (Tower 3)
Website
www.aranetacenter.net/cyberpark/index.php
www.aranetagroup.com/cyberpark/cyberpark-masterplan.php
www.aranetacitycyberpark.com

The Araneta City Cyberpark is an 8-hectare (20-acre) PEZA certified office development located within the Araneta City in Cubao, Quezon City. Located along the southern area of the mixed-use commercial development, the office complex is part of the Araneta City Master Plan and is currently undergoing a ₱20 billion redevelopment project under a new master plan which began in 2012. The present master plan consists of five green office towers, commercial spaces, and an outdoor park situated in between the complex. The office complex is designed by ASYA Design while ACI Inc. serves as the owner and developer of the project, which already has 3 towers completed and a total floor area of 288,000 m2 (3,100,006.20 sq ft) of office space as of September 2025.