Alto (high-speed rail)

Alto
Overview
Service typeHigh-speed rail
StatusIn planning
Locale
First service
  • Construction (estimate):
  • Starting 2029–2030
  • Opening (estimate):
  • 2035–2038 (phase 1)
  • 2041–2044 (full)
Current operatorCadence consortium (planned)
Route
TerminiToronto
Quebec City
Stops7
Distance travelled1,000 km (620 mi)
Technical
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Operating speedAt least 300 km/h (186 mph)
Track ownerGovernment of Canada
Company
TypeSubsidiary
FoundedNovember 29, 2022 (2022-11-29)
Headquarters
Montreal, Quebec
,
Canada
Key people
ParentVia Rail Canada Inc.
Websitewww.altotrain.ca/en
Route map
Quebec City
Trois-Rivières
Montreal
Laval
Ottawa
Peterborough
Toronto

Alto (stylized in all caps) is a planned high-speed rail line in Canada, intended to connect major cities including Toronto, Ottawa, Montreal, and Quebec City. The planning and development of the line is being overseen by a federal Crown corporation operating under the same name (legally VIA HFR – VIA TGF Inc.) which is a wholly owned subsidiary of Via Rail Canada Inc.

Announced by Prime Minister Justin Trudeau on February 19, 2025, Alto (previously Via HFR) will be co-developed by the private consortium Cadence (whose members include Keolis, SNCF, and Air Canada) as part of a design phase that is estimated to cost $3.9 billion and is expected to last six years. The preliminary cost for the network estimated between $60 billion and $90 billion. After co-designing the network with Alto, Cadence will build, finance, operate, and maintain the publicly-owned network.

The railway network will feature trains that will reach top speeds of 300 km/h (190 mph) or more (likely 320 km/h (200 mph)), much greater than that of Via Rail's current fastest services, which have a maximum operating speed of 100 mph (160 km/h) on select sections of track. The network is planned to consist of approximately 1,000 kilometres (620 mi) of new passenger-dedicated, mainly electrified track, and is expected to begin preliminary construction in 2029, with major construction beginning in 2030. The network will be built in phases, with the first phase from Ottawa and Montreal, with an intermediary station in Laval.