Airport line, Perth

Airport line
A train exiting a tunnel
A B-series train exiting the tunnel at High Wycombe
Overview
Other nameForrestfield–Airport Link (during construction)
OwnerPublic Transport Authority
LocalePerth, Western Australia
Termini
Stations
  • 3 (branch)
  • 20 (total)
Service
TypeSuburban rail
SystemTransperth
OperatorPublic Transport Authority
DepotClaisebrook railcar depot
Rolling stockTransperth B-series trains
Ridership6,229,613 (year to June 2026)
History
Work began3 November 2016
Opened9 October 2022 (2022-10-09)
Technical
Line length25.2 km (15.7 mi)
Number of tracks2
CharacterUnderground and at-grade
Track gauge1,067 mm (3 ft 6 in) narrow gauge
Electrification25 kV 50 Hz AC from overhead catenary and overhead rail
Operating speed130 km/h (81 mph)
SignallingFixed block signalling
Train protection systemAutomatic train protection
Route map
km
16.0
High Wycombe Bus transfer
13.5
Airport Central Perth Airport Bus transfer
10.8
Redcliffe Perth Airport Bus transfer
6.7
Bayswater Bus transfer
5.5
Meltham
4.5
Maylands
3.2
Mount Lawley
1.9
East Perth Transwa Indian Pacific
1.3
Claisebrook
0.9
McIver
0.0
Perth Transperth Transwa
1.6
City West
2.7
West Leederville
3.7
Subiaco Bus transfer
5.0
Daglish
5.9
Shenton Park Bus transfer
7.4
Karrakatta
8.0
Loch Street
8.6
Showgrounds Special event station
9.3
Claremont Bus transfer
Red shading denotes the Free Transit Zone

The Airport line is a suburban railway line in Perth, Western Australia, which is operated by the Public Transport Authority as part of the Transperth system. The Airport line is a branch of the Midland line and runs underground between Bayswater and High Wycombe via Perth Airport. The branch is 8.6 kilometres (5.3 mi) long and has three stations: Redcliffe, Airport Central, and High Wycombe stations. Airport line services continue west of Bayswater along the Midland and Fremantle lines via Perth station to terminate at Claremont station.

Known during construction as the Forrestfield–Airport Link, the line was constructed by a joint venture between Salini Impregilo and NRW. Construction started in November 2016 and tunnel boring started in July 2017. The construction process was beset by several problems, including ground disturbances caused by tunnelling, a sinkhole and groundwater leak during the construction of a cross-passage, several worker injuries, and poor work conditions. Tunnel boring was completed in April 2020, which was followed by the installation of overhead line equipment, tracks, and other equipment. In addition to the main contract, works included a turnback siding at Claremont station for Airport line trains to turn around, and upgrades to Claremont and Bayswater stations. Originally planned to open in 2020, the project was delayed several times due to the aforementioned problems and later supply chain issues caused by the COVID-19 pandemic; it eventually opened on 9 October 2022. The Forrestfield–Airport Link cost A$1.86 billion in total.

Transperth B-series trains, three cars in length, operate on the Airport line every 12 minutes during peak and every 15 minutes outside peak and on weekends. All Airport line branch stations are fully accessible and have 150-metre (490 ft) long platforms; train lengths are limited by most Midland and Fremantle line stations, which have platforms only 100 metres (330 ft) long. The installation of communications-based train control by 2027 will allow frequencies to increase and planned platform lengthening will allow train lengths to increase. In the year to June 2026, the Airport line had 6,229,613 boardings.