A7 motorway (Romania)

A7 motorway shield}}
A7 motorway
Overview of the A7 motorway as of August 2026
A7 Bacău Bypass, Holt Interchange.jpg
Interchange with the DN2F at Holt, east of Bacău
Route information
Maintained by Compania Națională de Administrare a Infrastructurii Rutiere
Length241.62 km (150.14 mi)
453.3 km (281.7 mi) planned
185.3 km (115.1 mi) under construction
56.1 km (34.9 mi) tendered
Existed2020–present
Major junctions
South end A 3 near Ploiești
Major intersections A 13 near Răcăciuni
A 8 near Pașcani
A 14 near Suceava
North end M 19 at Siret (border with Ukraine)
Location
CountryRomania
CountiesPrahova, Buzău, Vrancea, Bacău, Neamț, Iași, Suceava
Major citiesPloiești, Buzău, Focșani, Bacău, Roman, Pașcani, Suceava
Highway system
← A 6→ A 8

The A7 motorway (Romanian: Autostrada A7), also known as the Ploiești–Siret Motorway (Romanian: Autostrada Ploiești–Siret) or the Moldavia Motorway (Romanian: Autostrada Moldovei), is a partially built motorway in Romania, that upon completion will link Ploiești to the north-eastern part of the country, partly along the Pan-European Corridor IX. It will run along the route: Buzău, Focșani, Bacău, Roman, Pașcani, and Suceava, connecting to Ukraine's M19 highway near Siret.

As of September 2026, several segments of the motorway are done, totaling to 241.61 km of opened motorway. All other sections of the motorway are in various stages of tendering and construction.

The Pașcani – Siret section will be co-financed through EU funds, while the government wants the Ploiești – Pașcani section (excluding the Bacău bypass) to be financed through the Romanian PNRR (short for Planul Național de Redresare și Reziliență, part of the Next Generation EU package).