305 Test Pile
| 305 Test Pile | |
|---|---|
| Reactor concept | Materials testing reactor |
| Designed by | Manhattan Project |
| Operational | 1944 to 1972 |
| Status | Shut down |
| Location | Hanford Site |
| Main parameters of the reactor core | |
| Fuel (fissile material) | Natural uranium |
| Fuel state | Solid (rods) |
| Neutron energy spectrum | Slow |
| Primary control method | Lead cadmium ontrol rods |
| Primary moderator | Nuclear graphite (bricks) |
| Primary coolant | Air |
| Reactor usage | |
| Primary use | Materials testing |
| Power (thermal) | 50 W |
| Criticality (date) | March 1944 |
| Operator/owner | Hanford Engineer Works |
The 305 Test Pile was the first reactor built at the Hanford Site during the Manhattan Project. It achieved criticality in March 1944, becoming the world's fourth nuclear reactor. It tested the purity of the nuclear graphite and refined uranium used for all subsequent plutonium production reactors at the site during the Cold War, including the B Reactor and N Reactor.